Venice to Rijeka

Usa → Croatia · 977 records · Updated today
12.3d
at sea
22.1d
door-to-door
11.7–13.2 d typical (P25–P75)
Route comparison 1 path · 977 leg observations
Maersk
Direct
12.3d
977records
Maersk · P25–P75 11.7–13.2 d
Add 5.0d gate-in at Venice and 4.83d gate-out at Rijeka for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 97712.3d11.7–13.2 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Venice to Rijeka?

The median transit time is 12.3 days. This is based on 284 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Venice to Rijeka?

Most containers arrive within 11.7–13.2 days (P25–P75 of 977 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Venice to Rijeka?

The shipping distance from Venice to Rijeka is approximately 139 nautical miles (257 km).

Which shipping lines operate the Venice to Rijeka route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Venice to Rijeka route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Venice to Rijeka.

What is the typical door-to-door time from Venice to Rijeka?

Approximately 22.1 days door-to-door. The median gate-in dwell at Venice is 5.0 days. Vessel sail time from Venice to Rijeka is 12.3 days. The median gate-out dwell at Rijeka is 4.83 days.

About This Route

Container shipping from Venice to Rijeka spans approximately 139 nautical miles, equivalent to 257 kilometres of sea route. Our tracked dataset for this lane includes 977 records across qualifying paths. Of those, 284 containers were tracked end-to-end on the direct path (literally booked from Venice to Rijeka with no transshipment). The median sail time on direct service is 12.3 days. Most shipments arrive within 11.7 to 13.2 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 22.1 days. Median gate-in dwell at Venice is 5.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Venice to Rijeka is 12.3 days. Median gate-out dwell at Rijeka is 4.83 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 977 leg-level observations on the direct segment. Of those, 284 were containers literally booked direct from Venice to Rijeka and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. On the direct segment, the median sail time is 12.3 days, and the P25–P75 range runs from 11.7 to 13.2 days.

For planning purposes, treat the 11.7 to 13.2 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 1.5-day spread. When committing door-to-door dates to consignees, account for an additional 5.0 days of gate-in dwell at Venice and 4.83 days of gate-out dwell at Rijeka on top of the chosen sail time.

View Route on Map →