| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Tanjung Pelepas | 99 | 52.8d | 49.1–55.4 d | 5.34d |
| via Ningbo | 88 | 99.7d | 90.7–108.2 d | 7.64d |
| via Singapore | 29 | 82.0d | 58.7–111.0 d | 6.0d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 52.8 days, based on 216 tracked records on this lane.
Most containers arrive within 49.1–55.4 days (P25–P75 of 216 tracked records on this lane). Plan with this range, not a single number.
Yes. Tracked transshipment options include: Tanjung Pelepas (52.8d total, 99 records); Ningbo (99.7d total, 88 records); Singapore (82.0d total, 29 records).
Approximately 72.8 days door-to-door. The median gate-in dwell at Tianjin is 3.01 days. Vessel sail time from Tianjin to Dar Es Salaam is 52.8 days. The median gate-out dwell at Dar Es Salaam is 17.0 days.
Container shipping from Tianjin to Dar Es Salaam. Our tracked dataset for this lane includes 216 records across qualifying paths. The median sail time on the fastest tracked path is 52.8 days. Most shipments arrive within 49.1 to 55.4 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 72.8 days. Median gate-in dwell at Tianjin is 3.01 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Tianjin to Dar Es Salaam is 52.8 days. Median gate-out dwell at Dar Es Salaam is 17.0 days, covering discharge and the time before pickup at the destination terminal.
3 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Tianjin and Dar Es Salaam. The Tanjung Pelepas-routed path takes a median of 52.8 days based on 99 records, with a P25–P75 range of 49.1 to 55.4 days. Median dwell at the hub terminal on this path is 5.34 days. The Ningbo-routed path takes a median of 99.7 days based on 88 records, with a P25–P75 range of 90.7 to 108.2 days. Median dwell at the hub terminal on this path is 7.64 days. The Singapore-routed path takes a median of 82.0 days based on 29 records, with a P25–P75 range of 58.7 to 111.0 days. Median dwell at the hub terminal on this path is 6.0 days.
For planning purposes, treat the 49.1 to 55.4 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 6.3-day spread. When committing door-to-door dates to consignees, account for an additional 3.01 days of gate-in dwell at Tianjin and 17.0 days of gate-out dwell at Dar Es Salaam on top of the chosen sail time.