Shanghai to Caucedo

China → Dominican Republic · 141 records · Updated today
44.5d
at sea
53.0d
door-to-door
43.5–47.5 d typical (P25–P75)
Route comparison 1 path · 141 leg observations
MSC
Direct
44.5d
141records
MSC (122) · also COSCO (19) · P25–P75 43.5–47.5 d
Add 3.53d gate-in at Shanghai and 5.0d gate-out at Caucedo for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 14144.5d43.5–47.5 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Shanghai to Caucedo?

The median transit time is 44.5 days. This is based on 107 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Shanghai to Caucedo?

Most containers arrive within 43.5–47.5 days (P25–P75 of 141 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Shanghai to Caucedo?

The shipping distance from Shanghai to Caucedo is approximately 9,507 nautical miles (17,608 km).

Which shipping lines operate the Shanghai to Caucedo route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Shanghai to Caucedo route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Shanghai to Caucedo.

What is the typical door-to-door time from Shanghai to Caucedo?

Approximately 53.0 days door-to-door. The median gate-in dwell at Shanghai is 3.53 days. Vessel sail time from Shanghai to Caucedo is 44.5 days. The median gate-out dwell at Caucedo is 5.0 days.

About This Route

Container shipping from Shanghai to Caucedo spans approximately 9,507 nautical miles, equivalent to 17,608 kilometres of sea route. Our tracked dataset for this lane includes 141 records across qualifying paths. Of those, 107 containers were tracked end-to-end on the direct path (literally booked from Shanghai to Caucedo with no transshipment). The median sail time on direct service is 44.5 days. Most shipments arrive within 43.5 to 47.5 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 53.0 days. Median gate-in dwell at Shanghai is 3.53 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Shanghai to Caucedo is 44.5 days. Median gate-out dwell at Caucedo is 5.0 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 141 leg-level observations on the direct segment. Of those, 107 were containers literally booked direct from Shanghai to Caucedo and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. Containers carried by COSCO also traversed this corridor without an intermediate transshipment, generally as sub-segments of longer journeys. On the direct segment, the median sail time is 44.5 days, and the P25–P75 range runs from 43.5 to 47.5 days.

For planning purposes, treat the 43.5 to 47.5 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 4.0-day spread. When committing door-to-door dates to consignees, account for an additional 3.53 days of gate-in dwell at Shanghai and 5.0 days of gate-out dwell at Caucedo on top of the chosen sail time.

View Route on Map →