Shanghai to Ambarli

China → Turkey · 183 records · Updated today
55.1d
at sea
63.1d
door-to-door
55.1–55.1 d typical (P25–P75)
Route comparison 3 paths · 183 leg observations
Maersk
Direct
55.1d
49records
Maersk · P25–P75 55.1–55.1 d
via Tanjung Pelepas
60.0d+4.9d
104records
Maersk · P25–P75 57.9–62.6 d · +5.34d dwell at Tanjung Pelepas
via Port Said
61.2d+6.1d
30records
Maersk · P25–P75 59.1–62.9 d · +6.3d dwell at Port Said
Add 3.53d gate-in at Shanghai and 4.46d gate-out at Ambarli for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Tanjung Pelepas 10460.0d57.9–62.6 d5.34d
Direct 4955.1d55.1–55.1 d
via Port Said 3061.2d59.1–62.9 d6.3d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Shanghai to Ambarli?

The median transit time is 55.1 days. This is based on 3 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Shanghai to Ambarli?

Most containers arrive within 55.1–55.1 days (P25–P75 of 183 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Shanghai to Ambarli?

The shipping distance from Shanghai to Ambarli is approximately 8,060 nautical miles (14,928 km).

Which shipping lines operate the Shanghai to Ambarli route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Shanghai to Ambarli route?

Yes. Tracked transshipment options include: Tanjung Pelepas (60.0d total, 104 records); Port Said (61.2d total, 30 records).

What is the typical door-to-door time from Shanghai to Ambarli?

Approximately 63.1 days door-to-door. The median gate-in dwell at Shanghai is 3.53 days. Vessel sail time from Shanghai to Ambarli is 55.1 days. The median gate-out dwell at Ambarli is 4.46 days.

About This Route

Container shipping from Shanghai to Ambarli spans approximately 8,060 nautical miles, equivalent to 14,928 kilometres of sea route. Our tracked dataset for this lane includes 183 records across qualifying paths. Of those, 3 containers were tracked end-to-end on the direct path (literally booked from Shanghai to Ambarli with no transshipment). The median sail time on direct service is 55.1 days. Most shipments arrive within 55.1 to 55.1 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 63.1 days. Median gate-in dwell at Shanghai is 3.53 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Shanghai to Ambarli is 55.1 days. Median gate-out dwell at Ambarli is 4.46 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 49 leg-level observations on the direct segment. Of those, 3 were containers literally booked direct from Shanghai to Ambarli and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. On the direct segment, the median sail time is 55.1 days, and the P25–P75 range runs from 55.1 to 55.1 days.

2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Shanghai and Ambarli. The Tanjung Pelepas-routed path takes a median of 60.0 days based on 104 records, with a P25–P75 range of 57.9 to 62.6 days. Median dwell at the hub terminal on this path is 5.34 days. The Port Said-routed path takes a median of 61.2 days based on 30 records, with a P25–P75 range of 59.1 to 62.9 days. Median dwell at the hub terminal on this path is 6.3 days.

For planning purposes, treat the 55.1 to 55.1 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 0.0-day spread. When committing door-to-door dates to consignees, account for an additional 3.53 days of gate-in dwell at Shanghai and 4.46 days of gate-out dwell at Ambarli on top of the chosen sail time.

View Route on Map →