Savannah to Mundra

Usa → India · 192 records · Updated today
56.0d
at sea
64.0d
door-to-door
55.0–63.5 d typical (P25–P75)
Route comparison 1 path · 192 leg observations
MSC
Direct
56.0d
192records
MSC · P25–P75 55.0–63.5 d
Add 6.0d gate-in at Savannah and 2.0d gate-out at Mundra for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 19256.0d55.0–63.5 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Savannah to Mundra?

The median transit time is 56.0 days. This is based on 143 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Savannah to Mundra?

Most containers arrive within 55.0–63.5 days (P25–P75 of 192 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Savannah to Mundra?

The shipping distance from Savannah to Mundra is approximately 8,812 nautical miles (16,319 km).

Which shipping lines operate the Savannah to Mundra route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Savannah to Mundra route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Savannah to Mundra.

What is the typical door-to-door time from Savannah to Mundra?

Approximately 64.0 days door-to-door. The median gate-in dwell at Savannah is 6.0 days. Vessel sail time from Savannah to Mundra is 56.0 days. The median gate-out dwell at Mundra is 2.0 days.

About This Route

Container shipping from Savannah to Mundra spans approximately 8,812 nautical miles, equivalent to 16,319 kilometres of sea route. Our tracked dataset for this lane includes 192 records across qualifying paths. Of those, 143 containers were tracked end-to-end on the direct path (literally booked from Savannah to Mundra with no transshipment). The median sail time on direct service is 56.0 days. Most shipments arrive within 55.0 to 63.5 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 64.0 days. Median gate-in dwell at Savannah is 6.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Savannah to Mundra is 56.0 days. Median gate-out dwell at Mundra is 2.0 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 192 leg-level observations on the direct segment. Of those, 143 were containers literally booked direct from Savannah to Mundra and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. On the direct segment, the median sail time is 56.0 days, and the P25–P75 range runs from 55.0 to 63.5 days.

For planning purposes, treat the 55.0 to 63.5 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 8.5-day spread. When committing door-to-door dates to consignees, account for an additional 6.0 days of gate-in dwell at Savannah and 2.0 days of gate-out dwell at Mundra on top of the chosen sail time.

View Route on Map →