Nansha to Mombasa

China → Kenya · 309 records · Updated today
36.7d
at sea
52.4d
door-to-door
33.3–38.5 d typical (P25–P75)
Route comparison 2 paths · 309 leg observations
MaerskMSC
Direct
36.7d
273records
Maersk (262) · also COSCO (9), MSC (2) · P25–P75 33.3–38.5 d
via Singapore
50.7d+14.0d
36records
MSC, COSCO · P25–P75 47.7–58.7 d · +6.0d dwell at Singapore
Add 7.0d gate-in at Nansha and 8.69d gate-out at Mombasa for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 27336.7d33.3–38.5 d
via Singapore 3650.7d47.7–58.7 d6.0d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Nansha to Mombasa?

The median transit time is 36.7 days. This is based on 253 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Nansha to Mombasa?

Most containers arrive within 33.3–38.5 days (P25–P75 of 309 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Nansha to Mombasa?

The shipping distance from Nansha to Mombasa is approximately 5,622 nautical miles (10,413 km).

Which shipping lines operate the Nansha to Mombasa route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Nansha to Mombasa route?

Yes. Tracked transshipment options include: Singapore (50.7d total, 36 records).

What is the typical door-to-door time from Nansha to Mombasa?

Approximately 52.4 days door-to-door. The median gate-in dwell at Nansha is 7.0 days. Vessel sail time from Nansha to Mombasa is 36.7 days. The median gate-out dwell at Mombasa is 8.69 days.

About This Route

Container shipping from Nansha to Mombasa spans approximately 5,622 nautical miles, equivalent to 10,413 kilometres of sea route. Our tracked dataset for this lane includes 309 records across qualifying paths. Of those, 253 containers were tracked end-to-end on the direct path (literally booked from Nansha to Mombasa with no transshipment). The median sail time on direct service is 36.7 days. Most shipments arrive within 33.3 to 38.5 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 52.4 days. Median gate-in dwell at Nansha is 7.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Nansha to Mombasa is 36.7 days. Median gate-out dwell at Mombasa is 8.69 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 273 leg-level observations on the direct segment. Of those, 253 were containers literally booked direct from Nansha to Mombasa and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. Containers carried by COSCO and MSC also traversed this corridor without an intermediate transshipment, generally as sub-segments of longer journeys. On the direct segment, the median sail time is 36.7 days, and the P25–P75 range runs from 33.3 to 38.5 days.

One transshipment alternative is present in the dataset. The Singapore-routed path takes a median of 50.7 days based on 36 records, with a P25–P75 range of 47.7 to 58.7 days. Median dwell at the hub terminal on this path is 6.0 days.

For planning purposes, treat the 33.3 to 38.5 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 5.2-day spread. When committing door-to-door dates to consignees, account for an additional 7.0 days of gate-in dwell at Nansha and 8.69 days of gate-out dwell at Mombasa on top of the chosen sail time.

View Route on Map →