| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Lome | 64 | 119.0d | 95.0–124.0 d | 10.0d |
| via Tanjung Pelepas > Tanger Med | 51 | 84.8d | 78.9–97.4 d | 5.34d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 119.0 days, based on 115 tracked records on this lane.
Most containers arrive within 95.0–124.0 days (P25–P75 of 115 tracked records on this lane). Plan with this range, not a single number.
The shipping distance from Nansha to Conakry is approximately 10,177 nautical miles (18,849 km).
Yes. Tracked transshipment options include: Lome (119.0d total, 64 records); Tanjung Pelepas > Tanger Med (84.8d total, 51 records).
Approximately 132.0 days door-to-door. The median gate-in dwell at Nansha is 7.0 days. Vessel sail time from Nansha to Conakry is 119.0 days. The median gate-out dwell at Conakry is 6.0 days.
Container shipping from Nansha to Conakry spans approximately 10,177 nautical miles, equivalent to 18,849 kilometres of sea route. Our tracked dataset for this lane includes 115 records across qualifying paths. The median sail time on the fastest tracked path is 119.0 days. Most shipments arrive within 95.0 to 124.0 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 132.0 days. Median gate-in dwell at Nansha is 7.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Nansha to Conakry is 119.0 days. Median gate-out dwell at Conakry is 6.0 days, covering discharge and the time before pickup at the destination terminal.
2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Nansha and Conakry. The Lome-routed path takes a median of 119.0 days based on 64 records, with a P25–P75 range of 95.0 to 124.0 days. Median dwell at the hub terminal on this path is 10.0 days. The Tanjung Pelepas and Tanger Med-routed path takes a median of 84.8 days based on 51 records, with a P25–P75 range of 78.9 to 97.4 days. Median dwell at the hub terminal on this path is 5.34 days.
For planning purposes, treat the 95.0 to 124.0 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 29.0-day spread. When committing door-to-door dates to consignees, account for an additional 7.0 days of gate-in dwell at Nansha and 6.0 days of gate-out dwell at Conakry on top of the chosen sail time.