| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| Direct | 441 | 54.0d | 51.0–75.0 d | — |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 54.0 days. This is based on 193 containers tracked end-to-end on this exact direct path.
Most containers arrive within 51.0–75.0 days (P25–P75 of 441 tracked records on this lane). Plan with this range, not a single number.
The shipping distance from Mundra to Lome is approximately 7,429 nautical miles (13,758 km).
MSC line operates direct service on this lane in our tracked dataset.
No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Mundra to Lome.
Approximately 72.0 days door-to-door. The median gate-in dwell at Mundra is 7.0 days. Vessel sail time from Mundra to Lome is 54.0 days. The median gate-out dwell at Lome is 11.0 days.
Container shipping from Mundra to Lome spans approximately 7,429 nautical miles, equivalent to 13,758 kilometres of sea route. Our tracked dataset for this lane includes 441 records across qualifying paths. Of those, 193 containers were tracked end-to-end on the direct path (literally booked from Mundra to Lome with no transshipment). The median sail time on direct service is 54.0 days. Most shipments arrive within 51.0 to 75.0 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 72.0 days. Median gate-in dwell at Mundra is 7.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Mundra to Lome is 54.0 days. Median gate-out dwell at Lome is 11.0 days, covering discharge and the time before pickup at the destination terminal.
Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 441 leg-level observations on the direct segment. Of those, 193 were containers literally booked direct from Mundra to Lome and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. On the direct segment, the median sail time is 54.0 days, and the P25–P75 range runs from 51.0 to 75.0 days.
For planning purposes, treat the 51.0 to 75.0 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 24.0-day spread. When committing door-to-door dates to consignees, account for an additional 7.0 days of gate-in dwell at Mundra and 11.0 days of gate-out dwell at Lome on top of the chosen sail time.