| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Port Said | 155 | 58.7d | 57.1–60.5 d | 6.3d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 58.7 days, based on 155 tracked records on this lane.
Most containers arrive within 57.1–60.5 days (P25–P75 of 155 tracked records on this lane). Plan with this range, not a single number.
The shipping distance from Mersin to Ningbo is approximately 7,631 nautical miles (14,132 km).
Yes. Tracked transshipment options include: Port Said (58.7d total, 155 records).
Approximately 66.2 days door-to-door. The median gate-in dwell at Mersin is 5.59 days. Vessel sail time from Mersin to Ningbo is 58.7 days. The median gate-out dwell at Ningbo is 1.86 days.
Container shipping from Mersin to Ningbo spans approximately 7,631 nautical miles, equivalent to 14,132 kilometres of sea route. Our tracked dataset for this lane includes 155 records across qualifying paths. The median sail time on the fastest tracked path is 58.7 days. Most shipments arrive within 57.1 to 60.5 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 66.2 days. Median gate-in dwell at Mersin is 5.59 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Mersin to Ningbo is 58.7 days. Median gate-out dwell at Ningbo is 1.86 days, covering discharge and the time before pickup at the destination terminal.
One transshipment alternative is present in the dataset. The Port Said-routed path takes a median of 58.7 days based on 155 records, with a P25–P75 range of 57.1 to 60.5 days. Median dwell at the hub terminal on this path is 6.3 days.
For planning purposes, treat the 57.1 to 60.5 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 3.4-day spread. When committing door-to-door dates to consignees, account for an additional 5.59 days of gate-in dwell at Mersin and 1.86 days of gate-out dwell at Ningbo on top of the chosen sail time.