Koper to Dalian

Slovenia → China · 214 records · Updated today
74.5d
at sea
82.5d
door-to-door
71.7–77.3 d typical (P25–P75)
Route comparison 1 path · 214 leg observations
Maersk
via Port Said > Singapore
74.5d
214records
Maersk · P25–P75 71.7–77.3 d · +6.3d dwell at Port Said
Add 5.8d gate-in at Koper and 2.19d gate-out at Dalian for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Port Said > Singapore 21474.5d71.7–77.3 d6.3d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Koper to Dalian?

The median transit time is 74.5 days, based on 214 tracked records on this lane.

What is the typical range of transit times from Koper to Dalian?

Most containers arrive within 71.7–77.3 days (P25–P75 of 214 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Koper to Dalian?

The shipping distance from Koper to Dalian is approximately 9,066 nautical miles (16,790 km).

Are there transshipment options on the Koper to Dalian route?

Yes. Tracked transshipment options include: Port Said > Singapore (74.5d total, 214 records).

What is the typical door-to-door time from Koper to Dalian?

Approximately 82.5 days door-to-door. The median gate-in dwell at Koper is 5.8 days. Vessel sail time from Koper to Dalian is 74.5 days. The median gate-out dwell at Dalian is 2.19 days.

About This Route

Container shipping from Koper to Dalian spans approximately 9,066 nautical miles, equivalent to 16,790 kilometres of sea route. Our tracked dataset for this lane includes 214 records across qualifying paths. The median sail time on the fastest tracked path is 74.5 days. Most shipments arrive within 71.7 to 77.3 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 82.5 days. Median gate-in dwell at Koper is 5.8 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Koper to Dalian is 74.5 days. Median gate-out dwell at Dalian is 2.19 days, covering discharge and the time before pickup at the destination terminal.

One transshipment alternative is present in the dataset. The Port Said and Singapore-routed path takes a median of 74.5 days based on 214 records, with a P25–P75 range of 71.7 to 77.3 days. Median dwell at the hub terminal on this path is 6.3 days.

For planning purposes, treat the 71.7 to 77.3 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 5.6-day spread. When committing door-to-door dates to consignees, account for an additional 5.8 days of gate-in dwell at Koper and 2.19 days of gate-out dwell at Dalian on top of the chosen sail time.

View Route on Map →