Koper to Ashdod

Slovenia → Israel · 152 records · Updated today
20.6d
at sea
30.4d
door-to-door
19.2–21.0 d typical (P25–P75)
Route comparison 1 path · 152 leg observations
MSC
Direct
20.6d
152records
MSC (96) · also Maersk (51), COSCO (5) · P25–P75 19.2–21.0 d
Add 5.8d gate-in at Koper and 4.0d gate-out at Ashdod for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 15220.6d19.2–21.0 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Koper to Ashdod?

The median transit time is 20.6 days. This is based on 149 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Koper to Ashdod?

Most containers arrive within 19.2–21.0 days (P25–P75 of 152 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Koper to Ashdod?

The shipping distance from Koper to Ashdod is approximately 1,377 nautical miles (2,551 km).

Which shipping lines operate the Koper to Ashdod route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Koper to Ashdod route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Koper to Ashdod.

What is the typical door-to-door time from Koper to Ashdod?

Approximately 30.4 days door-to-door. The median gate-in dwell at Koper is 5.8 days. Vessel sail time from Koper to Ashdod is 20.6 days. The median gate-out dwell at Ashdod is 4.0 days.

About This Route

Container shipping from Koper to Ashdod spans approximately 1,377 nautical miles, equivalent to 2,551 kilometres of sea route. Our tracked dataset for this lane includes 152 records across qualifying paths. Of those, 149 containers were tracked end-to-end on the direct path (literally booked from Koper to Ashdod with no transshipment). The median sail time on direct service is 20.6 days. Most shipments arrive within 19.2 to 21.0 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 30.4 days. Median gate-in dwell at Koper is 5.8 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Koper to Ashdod is 20.6 days. Median gate-out dwell at Ashdod is 4.0 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 152 leg-level observations on the direct segment. Of those, 149 were containers literally booked direct from Koper to Ashdod and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. Containers carried by Maersk and COSCO also traversed this corridor without an intermediate transshipment, generally as sub-segments of longer journeys. On the direct segment, the median sail time is 20.6 days, and the P25–P75 range runs from 19.2 to 21.0 days.

For planning purposes, treat the 19.2 to 21.0 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 1.8-day spread. When committing door-to-door dates to consignees, account for an additional 5.8 days of gate-in dwell at Koper and 4.0 days of gate-out dwell at Ashdod on top of the chosen sail time.

View Route on Map →