Kattupalli to Vizhinjam Seaport

India → India · 549 records · Updated today
105.0d
at sea
202.0d
door-to-door
104.0–108.0 d typical (P25–P75)
Route comparison 2 paths · 549 leg observations
MSC
Direct
105.0d
523records
MSC · P25–P75 104.0–108.0 d
via Colombo
111.0d+6.0d
26records
MSC · P25–P75 111.0–118.0 d · +7.0d dwell at Colombo
Add 5.0d gate-in at Kattupalli and 92.0d gate-out at Vizhinjam Seaport for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 523105.0d104.0–108.0 d
via Colombo 26111.0d111.0–118.0 d7.0d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Kattupalli to Vizhinjam Seaport?

The median transit time is 105.0 days. This is based on 172 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Kattupalli to Vizhinjam Seaport?

Most containers arrive within 104.0–108.0 days (P25–P75 of 549 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Kattupalli to Vizhinjam Seaport?

The shipping distance from Kattupalli to Vizhinjam Seaport is approximately 813 nautical miles (1,506 km).

Which shipping lines operate the Kattupalli to Vizhinjam Seaport route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Kattupalli to Vizhinjam Seaport route?

Yes. Tracked transshipment options include: Colombo (111.0d total, 26 records).

What is the typical door-to-door time from Kattupalli to Vizhinjam Seaport?

Approximately 202.0 days door-to-door. The median gate-in dwell at Kattupalli is 5.0 days. Vessel sail time from Kattupalli to Vizhinjam Seaport is 105.0 days. The median gate-out dwell at Vizhinjam Seaport is 92.0 days.

About This Route

Container shipping from Kattupalli to Vizhinjam Seaport spans approximately 813 nautical miles, equivalent to 1,506 kilometres of sea route. Our tracked dataset for this lane includes 549 records across qualifying paths. Of those, 172 containers were tracked end-to-end on the direct path (literally booked from Kattupalli to Vizhinjam Seaport with no transshipment). The median sail time on direct service is 105.0 days. Most shipments arrive within 104.0 to 108.0 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 202.0 days. Median gate-in dwell at Kattupalli is 5.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Kattupalli to Vizhinjam Seaport is 105.0 days. Median gate-out dwell at Vizhinjam Seaport is 92.0 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 523 leg-level observations on the direct segment. Of those, 172 were containers literally booked direct from Kattupalli to Vizhinjam Seaport and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. On the direct segment, the median sail time is 105.0 days, and the P25–P75 range runs from 104.0 to 108.0 days.

One transshipment alternative is present in the dataset. The Colombo-routed path takes a median of 111.0 days based on 26 records, with a P25–P75 range of 111.0 to 118.0 days. Median dwell at the hub terminal on this path is 7.0 days.

For planning purposes, treat the 104.0 to 108.0 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 4.0-day spread. When committing door-to-door dates to consignees, account for an additional 5.0 days of gate-in dwell at Kattupalli and 92.0 days of gate-out dwell at Vizhinjam Seaport on top of the chosen sail time.

View Route on Map →