| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Damietta | 120 | 69.3d | 69.3–71.3 d | 6.0d |
| via Damietta > Singapore | 42 | 70.3d | 67.2–87.9 d | 6.0d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 69.3 days, based on 162 tracked records on this lane.
Most containers arrive within 69.3–71.3 days (P25–P75 of 162 tracked records on this lane). Plan with this range, not a single number.
Yes. Tracked transshipment options include: Damietta (69.3d total, 120 records); Damietta > Singapore (70.3d total, 42 records).
Approximately 79.6 days door-to-door. The median gate-in dwell at Iskenderun is 6.34 days. Vessel sail time from Iskenderun to Tianjin is 69.3 days. The median gate-out dwell at Tianjin is 4.0 days.
Container shipping from Iskenderun to Tianjin. Our tracked dataset for this lane includes 162 records across qualifying paths. The median sail time on the fastest tracked path is 69.3 days. Most shipments arrive within 69.3 to 71.3 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 79.6 days. Median gate-in dwell at Iskenderun is 6.34 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Iskenderun to Tianjin is 69.3 days. Median gate-out dwell at Tianjin is 4.0 days, covering discharge and the time before pickup at the destination terminal.
2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Iskenderun and Tianjin. The Damietta-routed path takes a median of 69.3 days based on 120 records, with a P25–P75 range of 69.3 to 71.3 days. Median dwell at the hub terminal on this path is 6.0 days. The Damietta and Singapore-routed path takes a median of 70.3 days based on 42 records, with a P25–P75 range of 67.2 to 87.9 days. Median dwell at the hub terminal on this path is 6.0 days.
For planning purposes, treat the 69.3 to 71.3 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 2.0-day spread. When committing door-to-door dates to consignees, account for an additional 6.34 days of gate-in dwell at Iskenderun and 4.0 days of gate-out dwell at Tianjin on top of the chosen sail time.