Gwangyang to Tanjung Pelepas

Korea → Malaysia · 431 records · Updated today
22.1d
at sea
32.3d
door-to-door
21.1–22.6 d typical (P25–P75)
Route comparison 1 path · 431 leg observations
Maersk
Direct
22.1d
431records
Maersk · P25–P75 21.1–22.6 d
Add 7.54d gate-in at Gwangyang and 2.68d gate-out at Tanjung Pelepas for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 43122.1d21.1–22.6 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Gwangyang to Tanjung Pelepas?

The median transit time is 22.1 days. This is based on 130 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Gwangyang to Tanjung Pelepas?

Most containers arrive within 21.1–22.6 days (P25–P75 of 431 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Gwangyang to Tanjung Pelepas?

The shipping distance from Gwangyang to Tanjung Pelepas is approximately 2,529 nautical miles (4,684 km).

Which shipping lines operate the Gwangyang to Tanjung Pelepas route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Gwangyang to Tanjung Pelepas route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Gwangyang to Tanjung Pelepas.

What is the typical door-to-door time from Gwangyang to Tanjung Pelepas?

Approximately 32.3 days door-to-door. The median gate-in dwell at Gwangyang is 7.54 days. Vessel sail time from Gwangyang to Tanjung Pelepas is 22.1 days. The median gate-out dwell at Tanjung Pelepas is 2.68 days.

About This Route

Container shipping from Gwangyang to Tanjung Pelepas spans approximately 2,529 nautical miles, equivalent to 4,684 kilometres of sea route. Our tracked dataset for this lane includes 431 records across qualifying paths. Of those, 130 containers were tracked end-to-end on the direct path (literally booked from Gwangyang to Tanjung Pelepas with no transshipment). The median sail time on direct service is 22.1 days. Most shipments arrive within 21.1 to 22.6 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 32.3 days. Median gate-in dwell at Gwangyang is 7.54 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Gwangyang to Tanjung Pelepas is 22.1 days. Median gate-out dwell at Tanjung Pelepas is 2.68 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 431 leg-level observations on the direct segment. Of those, 130 were containers literally booked direct from Gwangyang to Tanjung Pelepas and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. On the direct segment, the median sail time is 22.1 days, and the P25–P75 range runs from 21.1 to 22.6 days.

For planning purposes, treat the 21.1 to 22.6 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 1.5-day spread. When committing door-to-door dates to consignees, account for an additional 7.54 days of gate-in dwell at Gwangyang and 2.68 days of gate-out dwell at Tanjung Pelepas on top of the chosen sail time.

View Route on Map →