| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Bremerhaven | 205 | 64.8d | 60.0–70.1 d | 4.86d |
| via Wilhelmshaven | 143 | 71.3d | 68.0–75.0 d | 4.53d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 64.8 days, based on 348 tracked records on this lane.
Most containers arrive within 60.0–70.1 days (P25–P75 of 348 tracked records on this lane). Plan with this range, not a single number.
The shipping distance from Gdansk to Salalah is approximately 6,107 nautical miles (11,310 km).
Yes. Tracked transshipment options include: Bremerhaven (64.8d total, 205 records); Wilhelmshaven (71.3d total, 143 records).
Approximately 85.0 days door-to-door. The median gate-in dwell at Gdansk is 6.22 days. Vessel sail time from Gdansk to Salalah is 64.8 days. The median gate-out dwell at Salalah is 14.0 days.
Container shipping from Gdansk to Salalah spans approximately 6,107 nautical miles, equivalent to 11,310 kilometres of sea route. Our tracked dataset for this lane includes 348 records across qualifying paths. The median sail time on the fastest tracked path is 64.8 days. Most shipments arrive within 60.0 to 70.1 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 85.0 days. Median gate-in dwell at Gdansk is 6.22 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Gdansk to Salalah is 64.8 days. Median gate-out dwell at Salalah is 14.0 days, covering discharge and the time before pickup at the destination terminal.
2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Gdansk and Salalah. The Bremerhaven-routed path takes a median of 64.8 days based on 205 records, with a P25–P75 range of 60.0 to 70.1 days. Median dwell at the hub terminal on this path is 4.86 days. The Wilhelmshaven-routed path takes a median of 71.3 days based on 143 records, with a P25–P75 range of 68.0 to 75.0 days. Median dwell at the hub terminal on this path is 4.53 days.
For planning purposes, treat the 60.0 to 70.1 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 10.1-day spread. When committing door-to-door dates to consignees, account for an additional 6.22 days of gate-in dwell at Gdansk and 14.0 days of gate-out dwell at Salalah on top of the chosen sail time.