Poland → Usa · 133 records · Updated today
33.1d
at sea
42.8d
door-to-door
32.0–35.9 d typical (P25–P75)
Route comparison 3 paths · 133 leg observations
Maersk
via Bremerhaven
32.6d
50records
Maersk · P25–P75 30.5–36.5 d · +4.86d dwell at Bremerhaven
via Wilhelmshaven
33.1d+0.5d
59records
Maersk · P25–P75 32.0–35.9 d · +4.53d dwell at Wilhelmshaven
via Hamburg
35.9d+3.3d
24records
Maersk · P25–P75 32.4–40.6 d · +5.72d dwell at Hamburg
Add 6.22d gate-in at Gdansk and 3.5d gate-out at New York for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Wilhelmshaven 5933.1d32.0–35.9 d4.53d
via Bremerhaven 5032.6d30.5–36.5 d4.86d
via Hamburg 2435.9d32.4–40.6 d5.72d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Gdansk to New York?

The median transit time is 33.1 days, based on 133 tracked records on this lane.

What is the typical range of transit times from Gdansk to New York?

Most containers arrive within 32.0–35.9 days (P25–P75 of 133 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Gdansk to New York?

The shipping distance from Gdansk to New York is approximately 3,788 nautical miles (7,016 km).

Are there transshipment options on the Gdansk to New York route?

Yes. Tracked transshipment options include: Wilhelmshaven (33.1d total, 59 records); Bremerhaven (32.6d total, 50 records); Hamburg (35.9d total, 24 records).

What is the typical door-to-door time from Gdansk to New York?

Approximately 42.8 days door-to-door. The median gate-in dwell at Gdansk is 6.22 days. Vessel sail time from Gdansk to New York is 33.1 days. The median gate-out dwell at New York is 3.5 days.

About This Route

Container shipping from Gdansk to New York spans approximately 3,788 nautical miles, equivalent to 7,016 kilometres of sea route. Our tracked dataset for this lane includes 133 records across qualifying paths. The median sail time on the fastest tracked path is 33.1 days. Most shipments arrive within 32.0 to 35.9 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 42.8 days. Median gate-in dwell at Gdansk is 6.22 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Gdansk to New York is 33.1 days. Median gate-out dwell at New York is 3.5 days, covering discharge and the time before pickup at the destination terminal.

3 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Gdansk and New York. The Wilhelmshaven-routed path takes a median of 33.1 days based on 59 records, with a P25–P75 range of 32.0 to 35.9 days. Median dwell at the hub terminal on this path is 4.53 days. The Bremerhaven-routed path takes a median of 32.6 days based on 50 records, with a P25–P75 range of 30.5 to 36.5 days. Median dwell at the hub terminal on this path is 4.86 days. The Hamburg-routed path takes a median of 35.9 days based on 24 records, with a P25–P75 range of 32.4 to 40.6 days. Median dwell at the hub terminal on this path is 5.72 days.

For planning purposes, treat the 32.0 to 35.9 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 3.9-day spread. When committing door-to-door dates to consignees, account for an additional 6.22 days of gate-in dwell at Gdansk and 3.5 days of gate-out dwell at New York on top of the chosen sail time.