Gdansk to Mundra

Poland → India · 111 records · Updated today
65.1d
at sea
73.3d
door-to-door
57.9–71.2 d typical (P25–P75)
Route comparison 1 path · 111 leg observations
Maersk
via Bremerhaven > Salalah
65.1d
111records
Maersk · P25–P75 57.9–71.2 d · +4.86d dwell at Bremerhaven
Add 6.22d gate-in at Gdansk and 2.0d gate-out at Mundra for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Bremerhaven > Salalah 11165.1d57.9–71.2 d4.86d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Gdansk to Mundra?

The median transit time is 65.1 days, based on 111 tracked records on this lane.

What is the typical range of transit times from Gdansk to Mundra?

Most containers arrive within 57.9–71.2 days (P25–P75 of 111 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Gdansk to Mundra?

The shipping distance from Gdansk to Mundra is approximately 7,145 nautical miles (13,232 km).

Are there transshipment options on the Gdansk to Mundra route?

Yes. Tracked transshipment options include: Bremerhaven > Salalah (65.1d total, 111 records).

What is the typical door-to-door time from Gdansk to Mundra?

Approximately 73.3 days door-to-door. The median gate-in dwell at Gdansk is 6.22 days. Vessel sail time from Gdansk to Mundra is 65.1 days. The median gate-out dwell at Mundra is 2.0 days.

About This Route

Container shipping from Gdansk to Mundra spans approximately 7,145 nautical miles, equivalent to 13,232 kilometres of sea route. Our tracked dataset for this lane includes 111 records across qualifying paths. The median sail time on the fastest tracked path is 65.1 days. Most shipments arrive within 57.9 to 71.2 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 73.3 days. Median gate-in dwell at Gdansk is 6.22 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Gdansk to Mundra is 65.1 days. Median gate-out dwell at Mundra is 2.0 days, covering discharge and the time before pickup at the destination terminal.

One transshipment alternative is present in the dataset. The Bremerhaven and Salalah-routed path takes a median of 65.1 days based on 111 records, with a P25–P75 range of 57.9 to 71.2 days. Median dwell at the hub terminal on this path is 4.86 days.

For planning purposes, treat the 57.9 to 71.2 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 13.3-day spread. When committing door-to-door dates to consignees, account for an additional 6.22 days of gate-in dwell at Gdansk and 2.0 days of gate-out dwell at Mundra on top of the chosen sail time.