Gangavaram to Colombo

India → Sri Lanka · 271 records · Updated today
15.8d
at sea
22.6d
door-to-door
14.8–19.8 d typical (P25–P75)
Route comparison 1 path · 271 leg observations
MSC
Direct
15.8d
271records
MSC · P25–P75 14.8–19.8 d
Add 4.0d gate-in at Gangavaram and 2.82d gate-out at Colombo for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 27115.8d14.8–19.8 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Gangavaram to Colombo?

The median transit time is 15.8 days. This is based on 163 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Gangavaram to Colombo?

Most containers arrive within 14.8–19.8 days (P25–P75 of 271 tracked records on this lane). Plan with this range, not a single number.

Which shipping lines operate the Gangavaram to Colombo route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Gangavaram to Colombo route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Gangavaram to Colombo.

What is the typical door-to-door time from Gangavaram to Colombo?

Approximately 22.6 days door-to-door. The median gate-in dwell at Gangavaram is 4.0 days. Vessel sail time from Gangavaram to Colombo is 15.8 days. The median gate-out dwell at Colombo is 2.82 days.

About This Route

Container shipping from Gangavaram to Colombo. Our tracked dataset for this lane includes 271 records across qualifying paths. Of those, 163 containers were tracked end-to-end on the direct path (literally booked from Gangavaram to Colombo with no transshipment). The median sail time on direct service is 15.8 days. Most shipments arrive within 14.8 to 19.8 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 22.6 days. Median gate-in dwell at Gangavaram is 4.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Gangavaram to Colombo is 15.8 days. Median gate-out dwell at Colombo is 2.82 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 271 leg-level observations on the direct segment. Of those, 163 were containers literally booked direct from Gangavaram to Colombo and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. On the direct segment, the median sail time is 15.8 days, and the P25–P75 range runs from 14.8 to 19.8 days.

For planning purposes, treat the 14.8 to 19.8 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 5.0-day spread. When committing door-to-door dates to consignees, account for an additional 4.0 days of gate-in dwell at Gangavaram and 2.82 days of gate-out dwell at Colombo on top of the chosen sail time.

View Route on Map →