| Path | Records | Actual median | P25–P75 range | TS dwell |
|---|---|---|---|---|
| via Gioia Tauro | 147 | 54.2d | 49.2–60.2 d | 6.0d |
| via Piraeus > Port Said | 28 | 61.6d | 58.5–65.8 d | 8.01d |
All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.
The median transit time is 54.2 days, based on 175 tracked records on this lane.
Most containers arrive within 49.2–60.2 days (P25–P75 of 175 tracked records on this lane). Plan with this range, not a single number.
The shipping distance from Durres to Singapore is approximately 6,023 nautical miles (11,154 km).
Yes. Tracked transshipment options include: Gioia Tauro (54.2d total, 147 records); Piraeus > Port Said (61.6d total, 28 records).
Approximately 59.4 days door-to-door. The median gate-in dwell at Durres is 5.0 days. Vessel sail time from Durres to Singapore is 54.2 days. The median gate-out dwell at Singapore is 0.21 days.
Container shipping from Durres to Singapore spans approximately 6,023 nautical miles, equivalent to 11,154 kilometres of sea route. Our tracked dataset for this lane includes 175 records across qualifying paths. The median sail time on the fastest tracked path is 54.2 days. Most shipments arrive within 49.2 to 60.2 days, the P25–P75 range covering the middle half of observed transits.
The typical door-to-door figure is 59.4 days. Median gate-in dwell at Durres is 5.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Durres to Singapore is 54.2 days. Median gate-out dwell at Singapore is 0.21 days, covering discharge and the time before pickup at the destination terminal.
2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Durres and Singapore. The Gioia Tauro-routed path takes a median of 54.2 days based on 147 records, with a P25–P75 range of 49.2 to 60.2 days. Median dwell at the hub terminal on this path is 6.0 days. The Piraeus and Port Said-routed path takes a median of 61.6 days based on 28 records, with a P25–P75 range of 58.5 to 65.8 days. Median dwell at the hub terminal on this path is 8.01 days.
For planning purposes, treat the 49.2 to 60.2 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 11.0-day spread. When committing door-to-door dates to consignees, account for an additional 5.0 days of gate-in dwell at Durres and 0.21 days of gate-out dwell at Singapore on top of the chosen sail time.