Durban to Dalian

South Africa → China · 270 records · Updated today
46.2d
at sea
53.4d
door-to-door
43.8–49.8 d typical (P25–P75)
Route comparison 2 paths · 270 leg observations
MSC
via Singapore
46.2d
224records
MSC · P25–P75 43.8–49.8 d · +6.0d dwell at Singapore
via Mundra > Ningbo > Busan
78.0d+31.8d
46records
MSC · P25–P75 72.8–89.8 d · +7.0d dwell at Mundra
Add 5.0d gate-in at Durban and 2.19d gate-out at Dalian for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Singapore 22446.2d43.8–49.8 d6.0d
via Mundra > Ningbo > Busan 4678.0d72.8–89.8 d7.0d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Durban to Dalian?

The median transit time is 46.2 days, based on 270 tracked records on this lane.

What is the typical range of transit times from Durban to Dalian?

Most containers arrive within 43.8–49.8 days (P25–P75 of 270 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Durban to Dalian?

The shipping distance from Durban to Dalian is approximately 7,506 nautical miles (13,902 km).

Are there transshipment options on the Durban to Dalian route?

Yes. Tracked transshipment options include: Singapore (46.2d total, 224 records); Mundra > Ningbo > Busan (78.0d total, 46 records).

What is the typical door-to-door time from Durban to Dalian?

Approximately 53.4 days door-to-door. The median gate-in dwell at Durban is 5.0 days. Vessel sail time from Durban to Dalian is 46.2 days. The median gate-out dwell at Dalian is 2.19 days.

About This Route

Container shipping from Durban to Dalian spans approximately 7,506 nautical miles, equivalent to 13,902 kilometres of sea route. Our tracked dataset for this lane includes 270 records across qualifying paths. The median sail time on the fastest tracked path is 46.2 days. Most shipments arrive within 43.8 to 49.8 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 53.4 days. Median gate-in dwell at Durban is 5.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Durban to Dalian is 46.2 days. Median gate-out dwell at Dalian is 2.19 days, covering discharge and the time before pickup at the destination terminal.

2 transshipment alternatives appear in the dataset, each routing a container through one or more hub ports between Durban and Dalian. The Singapore-routed path takes a median of 46.2 days based on 224 records, with a P25–P75 range of 43.8 to 49.8 days. Median dwell at the hub terminal on this path is 6.0 days. The Mundra, Ningbo, and Busan-routed path takes a median of 78.0 days based on 46 records, with a P25–P75 range of 72.8 to 89.8 days. Median dwell at the hub terminal on this path is 7.0 days.

For planning purposes, treat the 43.8 to 49.8 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 6.0-day spread. When committing door-to-door dates to consignees, account for an additional 5.0 days of gate-in dwell at Durban and 2.19 days of gate-out dwell at Dalian on top of the chosen sail time.