Dong Nai to Davao

Vietnam → Philippines · 136 records · Updated today
19.5d
at sea
27.0d
door-to-door
19.5–19.5 d typical (P25–P75)
Route comparison 1 path · 136 leg observations
MSC
Direct
19.5d
136records
MSC · P25–P75 19.5–19.5 d
Add 3.0d gate-in at Dong Nai and 4.54d gate-out at Davao for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 13619.5d19.5–19.5 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Dong Nai to Davao?

The median transit time is 19.5 days. This is based on 132 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Dong Nai to Davao?

Most containers arrive within 19.5–19.5 days (P25–P75 of 136 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Dong Nai to Davao?

The shipping distance from Dong Nai to Davao is approximately 1,566 nautical miles (2,900 km).

Which shipping lines operate the Dong Nai to Davao route?

MSC line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Dong Nai to Davao route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Dong Nai to Davao.

What is the typical door-to-door time from Dong Nai to Davao?

Approximately 27.0 days door-to-door. The median gate-in dwell at Dong Nai is 3.0 days. Vessel sail time from Dong Nai to Davao is 19.5 days. The median gate-out dwell at Davao is 4.54 days.

About This Route

Container shipping from Dong Nai to Davao spans approximately 1,566 nautical miles, equivalent to 2,900 kilometres of sea route. Our tracked dataset for this lane includes 136 records across qualifying paths. Of those, 132 containers were tracked end-to-end on the direct path (literally booked from Dong Nai to Davao with no transshipment). The median sail time on direct service is 19.5 days. Most shipments arrive within 19.5 to 19.5 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 27.0 days. Median gate-in dwell at Dong Nai is 3.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Dong Nai to Davao is 19.5 days. Median gate-out dwell at Davao is 4.54 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 136 leg-level observations on the direct segment. Of those, 132 were containers literally booked direct from Dong Nai to Davao and tracked end-to-end on this exact path. MSC operates the dominant tracked direct service. On the direct segment, the median sail time is 19.5 days, and the P25–P75 range runs from 19.5 to 19.5 days.

For planning purposes, treat the 19.5 to 19.5 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 0.0-day spread. When committing door-to-door dates to consignees, account for an additional 3.0 days of gate-in dwell at Dong Nai and 4.54 days of gate-out dwell at Davao on top of the chosen sail time.

View Route on Map →