Dalian to Durban

China → South Africa · 144 records · Updated today
41.6d
at sea
47.4d
door-to-door
34.7–45.6 d typical (P25–P75)
Route comparison 1 path · 144 leg observations
Maersk
via Tanjung Pelepas
41.6d
144records
Maersk · P25–P75 34.7–45.6 d · +5.34d dwell at Tanjung Pelepas
Add 4.0d gate-in at Dalian and 1.83d gate-out at Durban for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
via Tanjung Pelepas 14441.6d34.7–45.6 d5.34d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Dalian to Durban?

The median transit time is 41.6 days, based on 144 tracked records on this lane.

What is the typical range of transit times from Dalian to Durban?

Most containers arrive within 34.7–45.6 days (P25–P75 of 144 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Dalian to Durban?

The shipping distance from Dalian to Durban is approximately 7,506 nautical miles (13,902 km).

Are there transshipment options on the Dalian to Durban route?

Yes. Tracked transshipment options include: Tanjung Pelepas (41.6d total, 144 records).

What is the typical door-to-door time from Dalian to Durban?

Approximately 47.4 days door-to-door. The median gate-in dwell at Dalian is 4.0 days. Vessel sail time from Dalian to Durban is 41.6 days. The median gate-out dwell at Durban is 1.83 days.

About This Route

Container shipping from Dalian to Durban spans approximately 7,506 nautical miles, equivalent to 13,902 kilometres of sea route. Our tracked dataset for this lane includes 144 records across qualifying paths. The median sail time on the fastest tracked path is 41.6 days. Most shipments arrive within 34.7 to 45.6 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 47.4 days. Median gate-in dwell at Dalian is 4.0 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Dalian to Durban is 41.6 days. Median gate-out dwell at Durban is 1.83 days, covering discharge and the time before pickup at the destination terminal.

One transshipment alternative is present in the dataset. The Tanjung Pelepas-routed path takes a median of 41.6 days based on 144 records, with a P25–P75 range of 34.7 to 45.6 days. Median dwell at the hub terminal on this path is 5.34 days.

For planning purposes, treat the 34.7 to 45.6 day P25–P75 range as the realistic arrival window for this lane. About half of all observed tracked shipments fell within that 10.9-day spread. When committing door-to-door dates to consignees, account for an additional 4.0 days of gate-in dwell at Dalian and 1.83 days of gate-out dwell at Durban on top of the chosen sail time.

View Route on Map →