Chornomorsk to Port Said

Ukraine → Egypt · 738 records · Updated today
29.6d
at sea
51.0d
door-to-door
28.1–30.2 d typical (P25–P75)
Route comparison 2 paths · 738 leg observations
Maersk
Direct
29.6d
710records
Maersk · P25–P75 28.1–30.2 d
via Ambarli
41.4d+11.8d
28records
Maersk · P25–P75 39.8–43.8 d · +10.15d dwell at Ambarli
Add 13.04d gate-in at Chornomorsk and 8.33d gate-out at Port Said for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 71029.6d28.1–30.2 d
via Ambarli 2841.4d39.8–43.8 d10.15d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Chornomorsk to Port Said?

The median transit time is 29.6 days. This is based on 317 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Chornomorsk to Port Said?

Most containers arrive within 28.1–30.2 days (P25–P75 of 738 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Chornomorsk to Port Said?

The shipping distance from Chornomorsk to Port Said is approximately 1,116 nautical miles (2,066 km).

Which shipping lines operate the Chornomorsk to Port Said route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Chornomorsk to Port Said route?

Yes. Tracked transshipment options include: Ambarli (41.4d total, 28 records).

What is the typical door-to-door time from Chornomorsk to Port Said?

Approximately 51.0 days door-to-door. The median gate-in dwell at Chornomorsk is 13.04 days. Vessel sail time from Chornomorsk to Port Said is 29.6 days. The median gate-out dwell at Port Said is 8.33 days.

About This Route

Container shipping from Chornomorsk to Port Said spans approximately 1,116 nautical miles, equivalent to 2,066 kilometres of sea route. Our tracked dataset for this lane includes 738 records across qualifying paths. Of those, 317 containers were tracked end-to-end on the direct path (literally booked from Chornomorsk to Port Said with no transshipment). The median sail time on direct service is 29.6 days. Most shipments arrive within 28.1 to 30.2 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 51.0 days. Median gate-in dwell at Chornomorsk is 13.04 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Chornomorsk to Port Said is 29.6 days. Median gate-out dwell at Port Said is 8.33 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 710 leg-level observations on the direct segment. Of those, 317 were containers literally booked direct from Chornomorsk to Port Said and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. On the direct segment, the median sail time is 29.6 days, and the P25–P75 range runs from 28.1 to 30.2 days.

One transshipment alternative is present in the dataset. The Ambarli-routed path takes a median of 41.4 days based on 28 records, with a P25–P75 range of 39.8 to 43.8 days. Median dwell at the hub terminal on this path is 10.15 days.

For planning purposes, treat the 28.1 to 30.2 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 2.1-day spread. When committing door-to-door dates to consignees, account for an additional 13.04 days of gate-in dwell at Chornomorsk and 8.33 days of gate-out dwell at Port Said on top of the chosen sail time.

View Route on Map →