Bremerhaven to New York

Germany → Usa · 497 records · Updated today
21.9d
at sea
31.0d
door-to-door
21.0–27.1 d typical (P25–P75)
Route comparison 1 path · 497 leg observations
Maersk
Direct
21.9d
497records
Maersk (378) · also MSC (119) · P25–P75 21.0–27.1 d
Add 5.65d gate-in at Bremerhaven and 3.5d gate-out at New York for door-to-door totals. Times are sail-only and exclude port dwell.

Path breakdown

PathRecordsActual medianP25–P75 rangeTS dwell
Direct 49721.9d21.0–27.1 d

All values are actuals from tracked container records. Paths flagged low n have fewer than 20 records and should be read as directional.

Frequently asked questions

How long does container shipping take from Bremerhaven to New York?

The median transit time is 21.9 days. This is based on 247 containers tracked end-to-end on this exact direct path.

What is the typical range of transit times from Bremerhaven to New York?

Most containers arrive within 21.0–27.1 days (P25–P75 of 497 tracked records on this lane). Plan with this range, not a single number.

What is the sea distance from Bremerhaven to New York?

The shipping distance from Bremerhaven to New York is approximately 3,450 nautical miles (6,390 km).

Which shipping lines operate the Bremerhaven to New York route?

Maersk line operates direct service on this lane in our tracked dataset.

Are there transshipment options on the Bremerhaven to New York route?

No transshipment paths are present in the tracked dataset for this lane — containers observed move directly from Bremerhaven to New York.

What is the typical door-to-door time from Bremerhaven to New York?

Approximately 31.0 days door-to-door. The median gate-in dwell at Bremerhaven is 5.65 days. Vessel sail time from Bremerhaven to New York is 21.9 days. The median gate-out dwell at New York is 3.5 days.

About This Route

Container shipping from Bremerhaven to New York spans approximately 3,450 nautical miles, equivalent to 6,390 kilometres of sea route. Our tracked dataset for this lane includes 497 records across qualifying paths. Of those, 247 containers were tracked end-to-end on the direct path (literally booked from Bremerhaven to New York with no transshipment). The median sail time on direct service is 21.9 days. Most shipments arrive within 21.0 to 27.1 days, the P25–P75 range covering the middle half of observed transits.

The typical door-to-door figure is 31.0 days. Median gate-in dwell at Bremerhaven is 5.65 days, representing the time a container spends at the origin terminal between arrival at the gate and loading onto the vessel. Vessel sail time from Bremerhaven to New York is 21.9 days. Median gate-out dwell at New York is 3.5 days, covering discharge and the time before pickup at the destination terminal.

Direct service — meaning no transshipment between origin and destination — is the dominant routing on this corridor. It is supported by 497 leg-level observations on the direct segment. Of those, 247 were containers literally booked direct from Bremerhaven to New York and tracked end-to-end on this exact path. Maersk operates the dominant tracked direct service. Containers carried by MSC also traversed this corridor without an intermediate transshipment, generally as sub-segments of longer journeys. On the direct segment, the median sail time is 21.9 days, and the P25–P75 range runs from 21.0 to 27.1 days.

For planning purposes, treat the 21.0 to 27.1 day P25–P75 range as the realistic arrival window for direct service. About half of all observed direct shipments fell within that 6.1-day spread. When committing door-to-door dates to consignees, account for an additional 5.65 days of gate-in dwell at Bremerhaven and 3.5 days of gate-out dwell at New York on top of the chosen sail time.

View Route on Map →